Adding single events as part of Compliance module
Use this approach to add a single Repeated Event to a building. To set up multiple events in a building from scratch, use Spreadsheet Setup. Go to the building where you wish to set up Repeated Events.
Compliance Dwellant
Go to Compliance > Planned Maintenance Event > List
Click "Add "
Select an optional template to base your new event on. Click OK. You can skip this step and complete the next 100% from scratch.
Complete the form - Part 1:
Template = completes fields based on PME template event
Name = needs to be unique within the building (and Block)
The Next or previous event date = designed to accept either date because, when a building is set up from scratch, the Property Manager may only know the previous event date and not wish to calculate the next themselves.
Repeated event entity type = Posting or Request
Who should handle this? = You can select: your own Managing Agency / Building / Contractor
Assigned group = Groups with the above organisation
When ready, click "Show"
Complete the form - Part 2:
Frequency = Days/Weeks/Month/Years
Category name = How is this tracked? Check your internal notes
Importance = Statutory/Recommend/Best Practice
Audience = Who do you want to see this?
Is document required = A must for many checks
Document library type*= This will automatically map the attached document into the document Library
*Not available in Classic Dwellant
Create new posting or request with every event? = If unticked, the previous request will be reopened.
This makes tracking performance a little harder, as you will have to check comment history, but it is great for weekly checks, as you have lots of requests.
Message template = Completes the subject and description for the request. Guide
Lead time in days = determines how many days before a request is created
Primary Block = Allows linking to existing blocks
Repeated event type = Fixed (subsequent iteration will be based on original date) or Variable (subsequent iteration will be based on event completion)
Survey Type = This will add the need for a C-Site survey to be completed
Note: Any requests will be created overnight after the PME is created.