Use this guide when a building currently managed on Dwellant needs to move from one Managing Agent (MA) to another.
Important warnings
- Authorisation must come from the incumbent / outgoing MA.
- The switch cannot be undone once completed.
- Records will be removed from the original MA’s live Dwellant site.
- Accounting package data is not changed by the switch itself.
- Dwellant may decline a switch if it cannot be completed while preserving data quality.
When to request a switch
A switch may be appropriate where the building has meaningful Dwellant data or services to preserve, including:
- Concierge HV
- Bespoke portal
- Compliance records
- Well-established posting or communication history
- Resident/user history
- Documents, contracts, requests or forms
- Existing Dwellant Core setup used by the new MA
When a switch may not be needed
A switch may not be appropriate where:
- The new MA does not use Dwellant
- There is limited data to share
- The building can be recreated more cleanly
- The history is complex, disputed or likely to be questioned
- The transfer would create duplicate or unreliable data
Switch scenarios
| Scenario | Likely route | Notes |
|---|---|---|
| Complete loss, new MA not on Dwellant | Offboard / archive | Usually not a true switch. Export required data and disable/archive as agreed. |
| Complete loss, new MA on Dwellant | Lift & Drop, or Clone & Merge | Depends on whether the new MA has already synced accounting or created duplicate data. Lift & Drop = Unsync existing building from old MA and move directly to new MA Clone & Merge = Create a second building, merge important data and delete off the rest |
| Partial loss, new MA on Dwellant | Custom plan | Requires review of blocks, shared users, HV, accounting and data structure. |
| Movement within an operating group | Internal seeding / clone process | Follow the internal operating-group process. |
Before submitting a request
Please confirm:
- Building name and address
- Outgoing MA and authorised signatory
- New MA and authorised signatory
- Target switch date
- Whether the new MA already uses Dwellant
- Whether the new MA has already synced accounting for the building or units
- Whether resident communications should be paused during the switch
What not to do
Please do not:
- Ask Dwellant to proceed without outgoing MA authorisation
- Sync accounting before Dwellant confirms it is safe
- Create duplicate buildings or units manually unless instructed
- Announce to residents before verification and sign-off
- Leave offboarding exports until after old access is removed
- Assume every historic item can be transferred in every scenario
What happens next
- The outgoing MA emails
success@dwellant.comwith the building list, reason and target date. - Dwellant confirms the likely scenario and technical path.
- Both MAs provide written authorisation.
- The outgoing MA generates the offboarding pack and required exports.
- The new MA provides branding, staff/admin details, unit naming and block grouping requirements.
- Dwellant schedules and executes the switch.
- The new MA spot-checks the building before residents are notified.
- Dwellant provides aftercare support for issues raised within the agreed window.
First meeting checklist
Discuss and decide:
- Which buildings or blocks are moving?
- Is the new MA already on Dwellant?
- Has accounting already been synced?
- Which technical path is likely: Lift & Drop, Clone & Merge, Straight-Up Clone or seeding?
- What products/data exist: Concierge HV, bespoke portal, compliance, documents, requests, forms, templates, payments, key tags, packages and calendars?
- What should the outgoing MA export before losing access?
- What unit naming and block groupings should the new MA use?
- Which staff/admin users should be added or removed?
- What branding and menu tiles are required on day one?
- Should resident communications be suppressed during the switch?
- Who gives final go/no-go?
- Who signs off after spot-checks?
HV-specific checks
Where Concierge HV, key tags, packages or concierge badges are in scope:
- Check staff and HV accounts have moved over correctly.
- Confirm whether key tags and concierge badges are branded to the old MA.
- If they are old-MA branded, agree whether they need to be changed to reflect the new MA.
- Save the uncollected package report before execution.
- Save the key tag report before execution.
- If any data is lost, recreated or remapped during the switch, test that QR codes scan correctly under the new building.
- Confirm whether QR codes or branded tags require remapping, replacement or additional lead time.
Spot-check before residents are notified
The new MA should verify:
- Correct building and block structure
- Unit count and naming
- Staff/admin permissions
- Resident login access
- Branding on portal and emails
- Documents, requests, forms and templates
- Accounting links where applicable
- HV staff accounts
- Packages, key tags, badges and QR-code scans
- Old MA access removed or restricted as agreed
Need help?
Email success@dwellant.com with the building name, outgoing MA, new MA, target date and whether accounting has already been synced.