Dwellant Compliance: setup and best practice guide

This guide details how to establish full building compliance within Dwellant, structuring the core Compliance Triad (Assets, PMEs, and Contracts) alongside Building Safety Act (BSA) data, document management, and approval workflows. 

1. Digital Twin & Building Information (BSA Baseline) 

Establishing a Digital Twin provides a single source of truth for physical building specs and statutory safety roles under the Building Safety Act.

  • Estate & Block Hierarchy: Configure the overarching estate, individual blocks, and floor levels.

Why: Establishes the digital framework so assets, maintenance tasks, and statutory records are anchored to their exact physical location in the building.

  • HRB Details: For Higher-Risk Buildings (HRBs), record building height, number of storeys, residential unit count, and registration numbers.

Why: Satisfies statutory Building Safety Act (BSA) reporting baselines and ensures the building's digital record contains mandatory compliance specifications.

  • Accountability Roles: Assign Principal Accountable Persons (PAPs) and Competent Persons to specific blocks.

Why: Provides transparent regulatory accountability, ensuring clear ownership for building safety cases during official audits.

The Building Information screen showing the HRB Overview tab with PAP, Competent Person assignments, and block specifications
  • Monthly Health & Safety Declarations: Enable the monthly H&S declaration prompt on the first of every month. If no incidents occurred, users log a clean confirmation, creating a verifiable audit trail.

Why: Creates a simultaneous audit trail proving ongoing safety oversight, allowing managers to demonstrate continuous compliance rather than reconstructing historical records retrospectively.

2. Asset Register Setup

The Asset Register catalogues all statutory, life safety, and plant equipment.

  • Asset Tree Breakdown: Visualise and maintain assets in a hierarchical tree view grouped by block and floor level (e.g., Lifts, Cold Water Storage Tanks, Dry Risers, Smoke Control).

Why: Prevents missed plant inspections by giving property teams a structured catalogue of every statutory and non-statutory asset on site.

The expanded Asset Tree interface displays building levels 
  • Asset Categorisation: Tag items by discipline (Life Safety, Electrical, Mechanical, Water Hygiene) to streamline filtering and bulk management.

Why: Enables bulk filtering, standardised reporting, and targeted routing of maintenance tasks to specialist trade contractors.

  • Bulk Configuration & Templates: Apply pre-set property templates (e.g., standard residential block vs. housing estate) or download CSV templates for bulk upload when setting up large portfolios.

Why: Eliminates repetitive manual data entry during onboarding and standardises asset naming conventions across multi-building estates.

3. Planned Maintenance Events (PMEs / Triggers)

PMEs act as automated system triggers to ensure regular safety checks take place and generate maintenance requests.

  • Template Association: Apply standard company PME templates to automatically populate event types, descriptions, and required categories.

Why: Mitigates operational risk by ensuring property managers apply approved, standardised scopes of work rather than drafting custom requests manually.

  • Event Frequency & Schedule Types:
    • Fixed: Executes on hard calendar dates (e.g., every 6 months on 1st Jan and 1st July) regardless of when the prior event was closed.
    • Variable: Calculates the next due date dynamically based on the completion date of the previous check.

Why: Accommodates different regulatory inspection criteria—some regulations require fixed statutory calendar dates, while others depend on cyclical intervals since the last completed service.

  • Daily Checks vs. Recurring Events: For daily checks, reopen and close a single rolling event rather than generating 365 standalone requests per year.

Why: Prevents system bloat and keeps work queues manageable by avoiding hundreds of redundant open/closed tickets.

  • Lead Times & Mandatory Uploads: Define advance notice windows and tick Document Required to prevent event completion without a signed certificate or report.

Why: Ensures contractors receive adequate advance warning while preventing jobs from closing without an auditable inspection certificate.

The Planned Maintenance Editor modal showing schedule intervals, lead times, mandatory document toggles, and assigned contractor groups
  • Permits to Work & Custom Sub-Forms: Attach custom forms (e.g., LOLER checklists, Hot Works permits) requiring mandatory completion by site staff or contractors prior to closure.

Why: Enforces safe working procedures on site and captures physical sign-offs directly inside the compliance event record.

  • Resident Portal Visibility: Toggle whether scheduled event notices and completion certificates are visible to leaseholders on their portal feed.

Why: Promotes transparency with residents for intrusive maintenance while keeping purely operational internal logs private.

4. Contractor & Contract Linkage

Dwellant links compliance and financial control through a structured relational triad.

┌──────────────┐         ┌──────────────┐         ┌──────────────┐

 Asset Tree         ──────>      PME Trigger         ──────>       Contract   

└──────────────┘         └──────────────┘         └──────────────┘

  • Triad Linkage Hierarchy: Always link Assets to PMEs, and PMEs to the Contract. Never attach raw assets directly to contracts.

Why: Preserves relational integrity; a contract pays for an event (the service/check), and the event inspects the asset. Bypassing PMEs breaks automated scheduling and reporting.

  • Approved Contractor Verification: Contractors must be marked as Approved with current insurance and RAMS; suspended or expired contractors cannot be assigned new contracts.

Why: Protects the managing agent from liability by preventing suspended or unaccredited vendors from receiving automated work orders.

  • Financial Controls & Tolerances:
    • Enter total contract values, billing schedules, and expected invoice counts.
    • Set a contract tolerance percentage (ensure you type %, e.g., 5% vs £5) to enable Auto-Approval when incoming invoices match the expected schedule.

Why: Enables automated invoice approval within predefined financial thresholds, removing low-value transactional approval bottlenecks from property managers.

  • Cost Coding & Service Charges: Map cost assignments directly to single or multiple service charge schedules to eliminate manual invoice routing.
The Contract Setup Form showing pricing schedules, tolerance percentage, and service charge cost assignments

Why: Ensures invoices are automatically coded to the correct service charge schedule on receipt, speeding up year-end accounting reconciliations.

  • Contract Renewal Reminders: Configure automated reminder alerts (e.g., 60-day notice) to trigger retendering workflows ahead of expiry.

Why: Prevents lapse in statutory coverage by giving property teams enough lead time to re-tender expiring contracts.

5. User Groups & Approval Routing

Role-based access determines who receives tasks, reviews documents, and approves invoices.

  • User Group Mapping:
    • Health & Safety Management: Accesses estate and portfolio-level compliance overviews.
    • Health & Safety Approval: Specific group tasked with reviewing uploaded certificates and signing off high-risk RAMS.
    • Property Managers: Assigned day-to-day building operations, localised alerts, and site permits.

Why: Maintains strict separation of duties, ensuring technical safety reviews are handled by qualified personnel while property managers focus on site operations

  • Task Routing Rules: Assign PME events directly to the contractor and managing agent group simultaneously rather than individual user accounts to prevent task bottlenecks.

Why: Avoids operational single point of failure bottlenecks if an individual team member is absent or leaves the organisation.

6. Verification, Monitoring & Golden Thread

Estate & Portfolio Compliance Dashboards: Track compliance status across buildings and the wider portfolio using clear traffic‑light indicators.

  • Compliance Status Key:
    • 🟢 Green: Completed and fully compliant within date range.
    • 🟠 Amber / Orange: Open request scheduled and within valid operational window (not late).
    • 🔴 Red: Overdue event or missing statutory inspection.
    • ❓ Question Mark: Asset exists in the register but lacks an active PME trigger.

Why: Provides an instant, traffic-light visual indicator across individual blocks or entire portfolios, highlighting compliance gaps (like untriggered assets) before audits occur.

The Portfolio View shows compliance status across all buildings at a snapshot
  • Planned Maintenance Calendar: Use the Portfolio View to track scheduled, open, and completed events across annual cycles. Clicking the paperclip icon opens all associated completion certificates in context.

Why: Gives managers a comprehensive schedule view to balance contractor visits across the year and quickly access completed certificates in context.

 

The Planned Maintenance Calendar view with the paperclip attachment modal open, showing real-time document verification in context
  • Document Library & Legal Packs: Uploaded certificates are automatically indexed with block tags, asset IDs, and date ranges. This automated metadata feeds directly into pre-formatted legal packs (such as LPE1/LP1 forms) without manual intervention.

Why: Supports the Building Safety Act Golden Thread by ensuring all evidence is pre-indexed, enabling instant generation of legal packs (e.g., LPE1/LP1 forms) without manual administrative searching.

 

 

 

 

 

 

 

 

 

 